Skip to content
01 Ledvice

Coal power plant wastewater treatment plant

ČEZ, a.s., Ledvice

The only supercritical unit in the Czech Republic with an output of 660 MW is in operation at this power plant. Four PROTUR turbines are installed at the outlet of the treated water into the Bílina river. The produced electrical energy is stored in a battery storage facility and subsequently used to illuminate the entire wastewater disposal area. This installation also allows the phasing of the produced electricity into the network and is equipped with remote access for online monitoring of operations. 

CONTACT

Petr Frydrych, MBA


frydrych@protur-turbine.com

Miloš Janeček

+420 724 259 934
janecek@protur-turbine.com

Lukáš Chmel, MBA


chmel@protur-turbine.com