Skip to content
04 COV

Output canal of the wastewater treatment plant

VODÁRENSKÁ AKCIOVÁ SPOLEČNOST, a.s, Žďár nad Sázavou

The PROTUR I turbine is installed at the outlet of treated water into the Sázava river. The treatment plant currently operates with a capacity of 35 000 sampling points and the turbine flows from 90l/s to 150l/s of water. The produced electrical energy is stored in a battery storage and then used to illuminate the adjacent area. The turbine operates in 24/7/360 mode.

CONTACT

Petr Frydrych, MBA


frydrych@protur-turbine.com

Miloš Janeček

+420 724 259 934
janecek@protur-turbine.com

Lukáš Chmel, MBA


chmel@protur-turbine.com