Skip to content
06

Fuse tanks of the wastewater disposal area

ČEZ, a.s., Prunéřov ​

Two PROTUR 300/I turbines in tandem are installed at the outflow of treated water into the river Ohre. The produced electrical energy is stored in a battery storage and subsequently used to illuminate the area of fuse tanks. This installation is, among other things, equipped with remote access for online traffic monitoring.

KONTAKT

Petr Frydrych, MBA

+420 602 300 277
frydrych@protur-turbine.com

Miloš Janeček

+420 724 259 934
janecek@protur-turbine.com

Lukáš Chmel, MBA

+420 775 707 902
chmel@protur-turbine.com