Wastewater treatment plant Žďár nad Sázavou
PROTUR is located at the outlet of treated water into the Sázava River. The energy is stored in a battery storage and is subsequently used for lighting the site. The wastewater treatment plant operates with a capacity of 35,000 points of use and 90-150 l/s flows through the turbine.