Autonomous hydroelectric power plant in a historic mill

Replacement of the Bánki turbine in the building of the historic mill

A PROTUR turbine of higher power with three casings at a head of 1.5 m was installed. The PROTUR turbine in this historical building replaced the Bánki turbine, which lost its effectiveness due to the decrease in flows compared to previous periods.