Autonomous hydroelectric power plant in a historic mill
Replacement of the Bánki turbine in the building of the historic mill
- · Internal installation of the PROTUR 300 turbine
- · Production of electricity for the building’s own consumption
- · Increased comfort for owners due to noiselessness and maintenance-free technology
A PROTUR turbine of higher power with three casings at a head of 1.5 m was installed. The PROTUR turbine in this historical building replaced the Bánki turbine, which lost its effectiveness due to the decrease in flows compared to previous periods.