References

20 02 ŽĎAS – PROTUR – Elektrárna Ledvice LQ-4

Coal power plant wastewater treatment plant

Coal power plant wastewater treatment plant ČEZ, a.s., Ledvice, Czech Republic Turbine model serie: PROTUR I Nominal output of the generator: 100 W Number of installed turbines: 4 The only…
19 12 ŽĎAS – PROTUR – Instalace na sádkách Kinský LQ-10

Fish hatcheries

Fish hatcheries KINSKÝ Žďár, a.s., Žďár nad Sázavou, Czech Republic Turbine model serie: PROTUR I Nominal output of the generator: 100 W Number of installed turbines: 1 A PROTUR I…
19 09 ŽĎAS – PROTUR – Instalace na ČOV Žďár nad Sázavou LQ-2

Output canal of the wastewater treatment plant

Output canal of the wastewater treatment plant VODÁRENSKÁ AKCIOVÁ SPOLEČNOST, a.s, Žďár nad Sázavou, Czech Republic Turbine model serie: PROTUR I Nominal output of the generator: 100 W Number of…

CONTACT

Petr Frydrych, MBA


frydrych@protur-turbine.com

Miloš Janeček

+420 724 259 934
janecek@protur-turbine.com

Lukáš Chmel, MBA


chmel@protur-turbine.com